HOW TO SET UP PIPE AND DRAPE

HOW TO SET UP PIPE AND DRAPE

The Foundation

  1. All crossbars layed out by lead 
  2. All base plates and pins are screwed in
  3. Base plates and pins are lined by lead or assigned by lead
  4. All uprights are put up ( make sure the top is lifted higher and not stuck)
  5. Drape is dropped by lead
  6. All drapes are sleeved

Going up

  1. Get on ladders next to the upright unless its a 7'-12' or 7'-17' 
  2. Hand crossbar with drape  to the crew members on the ladders
  3. Distributes the ruffles on the cross bar

 

 