HOW TO SET UP PIPE AND DRAPE
The Foundation
- All crossbars layed out by lead
- All base plates and pins are screwed in
- Base plates and pins are lined by lead or assigned by lead
- All uprights are put up ( make sure the top is lifted higher and not stuck)
- Drape is dropped by lead
- All drapes are sleeved
Going up
- Get on ladders next to the upright unless its a 7'-12' or 7'-17'
- Hand crossbar with drape to the crew members on the ladders
- Distributes the ruffles on the cross bar